203 Property Solar PV Installation in Sefton

Introduction

Castle Green, a prominent house builder based in North Wales, decided to add solar panels to over 200 properties on their Orchard Place development in Sefton, Liverpool. This initiative aimed not only to enhance the overall energy efficiency of the homes but also offered long-term cost savings to prospective buyers. The addition of solar panels demonstrates Castle Green’s commitment to sustainable building practices and providing energy-efficient housing.

Methodology

The JM Renewables team worked closely with Castle Green to plan and coordinate the solar panel installation. Recognising the advantages of fitting solar panels during the home’s construction phase, Castle Green opted for roof-integrated solar panels. This approach involved fitting the solar panels before adding the tiles, ensuring a streamlined aesthetic that complemented the homes overall design.

Working closely with roofing contractors, Castle Green ensured that the installation of solar panels was arranged to fit in with the tight construction schedule. The installation process was much more efficient and significantly reduced disruption by utilising existing scaffolding and concealing cables within the homes. This approach not only helped the visual appeal of the properties but also maximised the efficiency of the solar panels, enhancing their long-term performance.

Installation

The installation of solar panels on each property commenced on schedule and once in place, roofing contractors completed the fixing of the remaining roof tiles around them, ensuring a seamless fit into the roofline.

The incorporation of solar panels into the properties was met with enthusiasm from prospective buyers, who recognised the long-term benefits of reduced energy costs and enhanced sustainability. The integration of solar panels further increased the Energy Performance Certificate (EPC) rating of Castle Green’s homes, reinforcing their reputation for delivering energy-efficient properties.

Outcome

The addition of solar panels to 203 properties within Orchard Place development proved to be a resounding success for Castle Green. Not only did it enhance the energy efficiency and sustainability of the homes, but it also resonated positively with prospective buyers. The integration of solar panels into the construction process highlights Castle Green’s commitment to innovation and sustainability in residential development. Ultimately, Orchard Place stands as a testament to their dedication to providing high-quality, energy-efficient housing solutions that meet the needs of both future homeowners and the environment.

Gallery