Overview
We have completed a number of projects for colleges and schools. This aprticular project was for Coleg Menai and involved the design and installation of a 300kW solar PV system. The design uses Trina 375W solar panels and the Vandervalk flat roof mounting system. The installation was completed in just one week and is expected to provide significant cost savings and environmental benefits for the college.
Challenge
Coleg Menai was seeking to reduce its carbon footprint and energy costs by transitioning to renewable energy sources. They required a reliable and experienced company to design and install a solar PV system that would meet their energy needs and provide long-term benefits.
Solution
The system selected consisted of 375W high-efficiency Trina solar panels and a sturdy Vandervalk flat roof mounting system. The choice of Trina panels ensured maximum energy production and reliability, while the Vandervalk system provided robust protection against adverse weather conditions.
Results
The installation was carried out during half term to ensure that it would not cause any disruption to the students’ studies. Our team worked in close collaboration with the college to ensure that the installation met all safety and regulatory standards while also meeting their specific requirements.
The 300kW solar PV system installed by JMRS is expected to provide significant cost savings and environmental benefits for the college. The system will generate clean, renewable energy that can be used to power the college’s facilities, reducing their reliance on grid energy and lowering their energy costs.
Coleg Menai’s commitment to sustainability and environmental responsibility is commendable, and JM Renewable Solutions Ltd are proud to have been a part of this important project.