140kW Solar Panel Installation for PCO Group, Cheshire

Introduction

PCO Group, in Cheshire East, recognised the importance of renewable energy and partnered with JM Renewable Solutions Ltd to install a 140kW solar panel system. Our goal was to help PCO Group reduce their energy costs and carbon footprint while also increasing their energy independence.

Methodology

JM Renewable Solutions Ltd designed and installed a 140kW solar energy system at PCO Group’s Cheshire East location. The system was designed to meet the specific needs of the client, ensuring maximum efficiency and generation capacity.

Installation

The installation process was completed in just one week, demonstrating the efficiency and expertise of our team at JM Renewable Solutions Ltd. Our team of experienced installers and electricians worked efficiently to ensure the seamless and timely completion of the project.

In addition to the efficient and timely completion of the installation process, it’s important to note that we took all necessary safety precautions to ensure the wellbeing of our team and anyone on site. Prior to starting the installation, we conducted thorough risk assessments to identify any potential hazards and develop strategies to mitigate them. We followed strict health and safety standards throughout the installation process, ensuring that all equipment was properly installed and tested to ensure it met safety standards.

Furthermore, we had to gain approval from the Distribution Network Operator (DNO) before we could begin the installation. This was a complex process that required a deep understanding of the regulatory environment and extensive communication with the DNO. Fortunately, our team at JM Renewable Solutions Ltd handled this process expertly, and we received approval to proceed with the installation without any delays.

Outcome

Our team demonstrated exceptional expertise and efficiency in completing the installation, while also prioritising safety and regulatory compliance throughout the project.

The 140kW solar panel system is expected to generate 197,802kWh of clean energy each year, providing significant savings for PCO Group. The system is also going to reduce their carbon footprint, making a positive impact on the environment.

Gallery